Home Page NVS RO NVS HQ C.B.S.E NCERT City Web Portal RTE RTI facebook tweeter google linked in you tube


Thought of the Day : इससे पहले कि सपने सच हों आपको सपने देखने होंगे . BY: - ABDUL KALAM

Infrastructure

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

: 30 Acre

:  Yes

: 05/03/2001

Status of Boundary Wall

A.  Brick Wall

B.  Barbed wire fencing

(Completed )

(Completed )

Permanent buildings constructed

(CPWD pattern)

Complebuilding:

Dormitories:

With Warden Residence 08 Nos.

Girls _02_Nos.

with Warden Residence  04  Nos.

Kitchen/dining Hall

No. of shifts required for all students  to

take food

Complete

One Shift

Principal Residence

01  No.

Staff Quarters

Type III = 02 Blocks (08Nos.)

Type II = 01Block (04 Nos.)

Type  I  =  01 Block (04Nos.)

M.P. Hall

Not available

Workshop

Not available

Type of O.H. Tank

Its capacity

Present Status

Shaft type / Column based

01 Lac litres

Working satisfactory

U.G. tank

Its capacity

Present Status

03 Lac liter

01 Lac litres

Working satisfactory

D.G. Set

Available (01)

HONDA   6KW

Sewage Pump

NOT AVAILABLE .

Water Pump

02 Nos 10 H.P.- Capacity

Electrification

Electric connection

Sub Station building

Street lighting

Numbers of hrs. During day when power supply is available on an average.

ST Loading

Urban Feeder

N.A

58 Nos. of Poles

09 hrs.

Playfields

Hockey

Football

400 meter track

40 x 30 meter basket ball court

40 x 30 meter volley ball court

Kho-Kho

Handball

Not Available

01

Under construction

02 Nos. Available

02 Nos Available

02 Nos Available

03 Nos Available

Water supply

Tube Well

Hand pump

Connection from PHED

Potable, 04 Nos. -  working(1) FULL FUNCTIONALITY

YES

Nil

Rajiv Gandhi Smriti Van

Fully Developed

Firefighting arrangement

Campus overall

Working

Beautiful campus with Eco-friendly environment

Last date of cleaning of

(a) Septic tank

(b) Water tanks

15.10.2016

10.06.2017